[1]
Oktaviani, I., Sampurna, H., Hirwo, N.T., Saputra, D.H. and Putra, J. 2026. EVALUATION OF PARAMETRIC COST ESTIMATES FOR THE BUDGET CEILING FOR THE CONSTRUCTION OF THE BEKASI DISTRICT ATTORNEY’S OFFICE BUILDING. Jurnal Ilmiah METADATA. 8, 1 (Jan. 2026), 55-72. DOI:https://doi.org/10.47652/metadata.v8i1.942.