REVIEW OF WORK USING THE EARNED VALUE ANALYSIS METHOD ON THE PLTG GRATI TO PESANGGARAN BALI PROJECT

Authors

  • Ike Oktaviani Program Studi Teknik Sipil, Institut Teknologi Budi Utomo, Jakarta.
  • Hendry Sampurna Program Studi Teknik Sipil, Institut Teknologi Budi Utomo, Jakarta.
  • Ngir Tjuk Hirwo Program Studi Teknik Sipil, Institut Teknologi Budi Utomo, Jakarta.
  • Draga Hasan Saputra Program Studi Teknik Sipil, Institut Teknologi Budi Utomo, Jakarta.
  • Jon Putra Program Studi Teknik Sipil, Institut Teknologi Budi Utomo, Jakarta.

DOI:

https://doi.org/10.47652/metadata.v7i2.620

Keywords:

Review, Work Acceleration, Earned Value Analysis (EVA) Method, Cost, Time

Abstract

In construction projects, acceleration work has significant relevance in the modern construction industry. The Grati Gas Power Plant (PLTG) Relocation project to Pesanggaran Bali has a work implementation period of 460 days or 15 months. However, the Job Owner requested to complete it with a duration of 10 months. This study uses the Earned Value Analysis (EVA) method with direct observation in accelerating the work. By accelerating the work on the Grati Gas Power Plant (PLTG) Relocation project to Pesanggaran Bali, it can be estimated that the work can be completed on time according to the job owner's request, which is 10 months. Regarding the cost implications that occur due to the acceleration of the work, the estimated expenditure is smaller than the planned budget so that the project is estimated to have potential profit. And also make an estimated calculation in carrying out the acceleration of the work and record all costs incurred in implementing the acceleration of the work, so that the costs incurred (Actual Cost) are not greater than the budget planned at the beginning of the work or Budget At Complection (BAC).

References

Dipohusodo, I. 1996. Project Management and Construction Volume 2. Kanisius. Yogyakarta.

Ervianto, W. I. 2004. Construction Project Management Application Theory. Andi. Yogyakarta.

Frederika, Ariany. 2010. Analysis of Acceleration of Implementation by Increasing Optimal Working Hours in Construction Projects. Journal of the Faculty of Engineering, Udayana University. Denpasar.

Sultan Syah, M. 2004. Project Management. Grammar. Jakarta.

W. Soemardi, B., Abduh, M., D. Wirahadikusumah, R., & Pujoartanto, N. 2007. The Concept of Earned Value for Construction Project Management. Bandung Institute of Technology. Bandung

Giawa, P., Ichsan, R. N., & Hiya, N. (2025). Pengaruh Lokasi dan Promosi Terhadap Minat Masyarakat Menggunakan Jasa Pegadaian Melalui Kepuasan Nasabah Sebagai Variabel Mediasi Pada PT. Pegadaian (Persero) Upc Pelajar Medan. Economics and Digital Business Review, 6(2), 1303-1314.

Barus, E. E., Nasution, V. F. H., Ichsan, R. N., Syahbudi, M., & Barus, I. I. (2025). Development Of Canvas Model Business-Based Cooperatives: Ideas In The Development Of Independent Houses Of Worship In Medan City. Strategic Management Business Journal, 5(01).

Ichsan, R. N., Siregar, B. A., Suma, D., Nst, V. F. H., & Lubis, F. P. A. (2025). Halal Industry In The Fulfillment Of Sharia Maqasid: A Qualitative Study On Halal Business Actors In North Sumatra. Jurnal Ilmiah METADATA, 7(2), 80-97.

Nst, V. F. H., Wijaya, D. M., & Azaman, A. (2025). The Impact Of Change Management Organizational Innovation In Higher Education Institutions In North Sumatra. INFOKUM, 13(03), 624-632.

Downloads

Published

2025-05-30

How to Cite

Oktaviani, I., Sampurna, H., Hirwo, N. T., Saputra, D. H., & Putra, J. (2025). REVIEW OF WORK USING THE EARNED VALUE ANALYSIS METHOD ON THE PLTG GRATI TO PESANGGARAN BALI PROJECT. Jurnal Ilmiah METADATA, 7(2), 145-153. https://doi.org/10.47652/metadata.v7i2.620